Home
About
Services
Products
Images
Video
Contact

Cost Advantages

Time:

Less time to completion means project earns a profit sooner

Labor:
Less billable hours for each construction crew.
Large crews are not needed. Smaller crews are more efficient because there are no idle laborers and supervision is much easier.
Shell erection is easier so crews don't need to be highly trained.
Fewer framers are needed for each project
Less labor for insulating crew, no additional insulation is required on exterior walls or ceiling.
Less labor for drywall crews and siding installers because there is no time wasted searching for studs.
There are no soffit boxes to be built.
There are no headers to be built above windows or doors.
With pre-cut chases from the factory, electricians will spend less time on the job.
Materials:
Less framing material is needed for exterior walls, soffit boxes, window and door headers, sheathing, sill and top plates.
Fewer fasteners are needed.
Less insulation material needed.
Less shipping required, all exterior materials come i none package saving money on delivery from lumberyards.
Precision:
A more perfect structure ( square and plumb walls and roof ) makes it easier to finish.
Less time needed to cut and install drywall and siding.
Floor packages are easier to set, because openings are more perfectly cut at the factory then they can be built on the job site.
Safety:
Less time on the job means fewer accidents, injuries and fewer Insurance claims.
Efficiency:
Less expensive heating and cooling systems may be used, since there is less energy loss, saving the contractor money.
Less material waste costs, less to dispose in construction waste and better for the environment.
Less energy use and lower utility bills, is attractive to Energy conscience and environmental consumers.
Professional Services:
Structural Engineering is included in each package.
Experience on-site help available.


© Eco Envi, Inc.